Needham Ranch Industrial Park
Needham Ranch Industrial Park Client: Oltmans Construction Location: Newhall, CA Project Type: Grading Description: For this ambitious project, C. A. Rasmussen, Inc. was selected to grade the mountainous site and create building pads to accommodate eight industrial buildings. More that 4 million cubic yards of dirt was moved within a 12-month period. Three major milestones made […]
Springville Drive Interchange over Hwy 101
Springville Drive Interchange over Hwy 101 Client: City of Camarillo Location: Camarillo Project Type: Highways, Bridges & Structures Description: The Ventura County Chapter of the American Public Works Association recognized the Springville Interchange Project as its Transportation Project of the Year in 2013. The new diamond interchange provides access to the highway from local streets […]
POLB Harbor Scenic Drive
POLB Harbor Scenic Drive Client: Port of Long Beach Location: Long Beach, CA Project Type: Description: This 11 phase project had Rasmussen working inside the Port of Long Beach busy Pier J rebuilding the intersection installing new drainage, Concrete Pavement and Asphalt. Traffic handling was key to success as truck entering and exiting the Port of […]
Route 138 Widening
Route 138 Widening Client: Caltrans Location: Hwy 138, Pearblossom Project Type: Highways Description: Widen 2.5 miles of Route 138. The project required Rasmussen to place 13,000 cy of Lean concrete Base and place 18,000 TN of Asphalt Concrete. Rasmussen set over 2 miles of K-Rail to complete the project in 2 phases.
I-5 Colorado Bridge Off Ramp Widening
I-5 Colorado Bridge Off Ramp Widening Client: Caltrans Location: I-5 Colorado St Project Type: Highways Description: Rasmussen widen the existing North Bound off ramp at Colorado St on Interstate 5. As part of the project the off ramp widening included the widening of the exiting bridge that crossed the Los Angeles River. Rasmussen had to work closely […]
118 Fwy Resurfacing and Striping
118 Fwy Resurfacing and Striping Client: Caltrans Location: Simi Valley Project Type: Highways Description: Remove and replacement of 85,000 TNS of Rubberized Hot Mix Asphalt on HWY 118. Remove and Replacement of 2,000 CY of concrete freeway sections with Rapid Set Concrete. Rasmussen performed 80% of the work at night under live traffic. At completion 14 […]
118 Fwy Widening & Soundwalls
118 Fwy Widening & Soundwalls Client: Caltrans Location: Simi Valley Project Type: Highways Description: This Caltrans project widened a 6 mile stretch of the 118 Freeway in Simi Valley. It included the widening of four bridges, construction of 3 miles of soundwalls, and construction of an additional lane of traffic in the eastbound center median. The […]
I-5 and Western Avenue Ramps and Retaining Walls
I-5 and Western Avenue Ramps and Retaining Walls Client: Caltrans Location: Glendale Project Type: Highways Description: The modification of on- and off-ramps at Western Avenue along the northbound Interstate 5 was built to relieve traffic congestion in the area, which is home to several entertainment companies, including Walt Disney Co. and ABC-7. The ramps were relocated to […]
Route 33 Rock Weir System
Route 33 Rock Weir System Client: Caltrans Location: Samta Paula Project Type: Bridges and Structures Description: The Hwy 150 rock weir job was a fish ladder built from rip rap to restore Steelhead migration up Santa Paula Creek. The first season of work saw many delays as Caltrans redesigned the diversion system. Originally planned to […]
Lindero Canyon On-Ramp Improvements
Lindero Canyon On-Ramp Improvements Client: City of Westlake Village Location: Westlake Village Project Type: Highways Description: This intersection improvement included the construction of a retaining wall system as well as the widening of the U.S. Route 101 northbound on-ramp and auxiliary lane. The scope of work also included roadway drainage, pavement delineation, electrical work and […]