Description: Rasmussen widen the existing North Bound off ramp at Colorado St on Interstate 5. As part of the project the off ramp widening included the widening of the exiting bridge that crossed the Los Angeles River. Rasmussen had to work closely with CALTRANS and various environmental groups while working over the existing river to ensure there were no environmental impact in the river during construction.