Client: Caltrans
Location: Hwy 138, Pearblossom
Project Type: Highways
Description: Widen 2.5 miles of Route 138. The project required Rasmussen to place 13,000 cy of Lean concrete Base and place 18,000 TN of Asphalt Concrete. Rasmussen set over 2 miles of K-Rail to complete the project in 2 phases.